According to the public relations of JISCO, While referring to the technical specifications of this metal frame, Mr. Ahmadi emphasized that considering that the frame or building structure is considered the basis of a building and making changes, improvements or retrofits after its completion is very difficult and costly and in some cases impossible, we used the utmost care in choosing the system used in the construction of this structure.
Mr. Ahmadi added that modern anti-earthquake resistant systems called Buckling Restrained Brace (BRB) have been used in the skeleton of this building so that in the event of a strong earthquake, the building, which has a high strategic importance, can maintain its operational performance.
The managing director of Jahed Investment Company continued that bolts and nuts are used in this skeleton, which increases the speed of installation of the structure, and also its strength creates more assurance.
Mr. Ahmadi expected that the operation of installing the metal framework of 2nd building of the Iran Ministry of Agriculture will start in the second half of July after the strength of the foundation concrete.
دیدگاه خود را بنویسید